| L-1011 Trainer - AC/DC Power System |
Started the installation of the AC bus system today. The L-1011 has a number of AC buses and today we started installing the three primary buses: AC Bus 1, AC Bus 2 and AC Bus 3. Each bus has a control relay that turns power to the bus on and off and will be controlled via the Electric System panel on the Second Officer's console. In addition to the control relay each bus also has a relay that turns on when the bus is powered, i use this to "sense" the state of the bus. Below is an image of the 3 primary buses as installed into the simulator power rack.
![]() |
| L-1011 Trainer - AC Bus System |
Next will be the installation of the AC Tie bus as well as the DC Power buses.