L-1011 CPT Installation: Indicator Power |
Now with the AC and DC systems finished we can start powering system panels. The first set of panels are the two eye-brow panels below the overhead panel and two panels on the right hand side column of the overhead panel. Below is an image that shows the location of the 4 panels that are now connected to the PILOT INDICATOR LIGHT bus.
L-1011 CPT Installation: Indicator Power |
The contrast on the switchlights is a bit high and are hard to photograph. Eventually the indicator brightness will be selectable between BRT and DIM. However, this feature has not been implemented yet. Over the next few sessions we will power up all of the elements on the Lockheed L-1011 overhead panel.
L-1011 Trainer Installation: Overhead Panel Indicator Lighting |
No comments:
Post a Comment